Exterior of addition finished in T1-11 (textured wood siding).
|
Before photo.
|
After photo of 2 Story addition in Alexandria.
|
Before photo.
|
Side of addition.
|
Side before photo.
|
Foundation of addition being installed.
|
Lower level framing from side of addition.
|
Framing of lower level from rear of addition.
|
Plywood being installed.
|
Rear view of upper level being framed. Chimney was extended to be incorporated into new addition.
|
Front of addition being framed up.
|
Interior of upper level of addition.
|
Another interior view of addition.
|
T1-11 siding being installed.
|